ServiceUpdated on 12 September 2025
High temperature equipment testing for geothermal wells
About
Conduct full-scale geothermal well equipment tests in controlled laboratory conditions to de-risk new technologies and reproduce failures in existing equipment. Reproduce structural loads, thermal cycles, pressure and flow conditions, including highly corrosive environments at full-scale. Tests focus on downhole equipment including vacuum insulated tubing, sand control systems, and pumps.
Organisation
Similar opportunities
Service
Geothermal well casing connection evaluation
Brian Wagg
Director, Business Development at C-FER Technologies (1999) Inc.
Edmonton, Canada
Service
Lab test facility - monitoring system - fatigue test -
- R&D Partner
- Demonstrator
- Technology Partner
- Validator/Living Lab
- Project Conception and/or Coordination
Lamine Dieng
Researcher - Project Lead at Université Gusave Eiffel - Campus Nantes - Pays de la Loire
France
Project cooperation
Developing a reliability-based design method for CO2 pipelines
Brian Wagg
Director, Business Development at C-FER Technologies (1999) Inc.
Edmonton, Canada