CETPartnership
HomeOrganisers for Matchmaking
Register
Register
Register

Project cooperationUpdated on 26 August 2026

E-Bus Depots as Regional Flexibility Assets: Smart Depot Charging, Grid-Aware Fleet Operation and V2G Readiness

Ezgi SANLI

Project Specialist at BOZANKAYA TEKNOLOJİ

Ankara, Türkiye

About

THE REGIONAL CHALLENGE WE WANT TO WORK ON

In most European cities the electrification of public transport is planned as a fleet procurement, not as a grid event. A single bus depot recharging overnight can become the largest new load on a distribution feeder, triggering connection-capacity constraints and reinforcement costs. At the same time, that depot is one of the few large, predictable and centrally dispatchable loads in the region, because it runs on a published timetable. We want to turn depot charging from a grid problem into a regional flexibility resource, and validate it with a DSO and a municipal operator in a real region.

WHAT BOZANKAYA TEKNOLOJI BRINGS (FIELD-PROVEN, TRL 7-9)

Timetable-driven charging optimisation (ICMS): energy demand forecasting from the service schedule and live vehicle data, real-time SoC monitoring, and charging prioritisation that explicitly respects transformer and grid connection limits.

Charging station software: CCS2-compliant charger controller software, communication and management layer, embedded HMI; developed against IEC 61851, ISO 15118 and OCPP 2.0.1.

Vehicle-side control: ECU/VCU/DDU embedded software for e-buses and trolleybuses, covering energy management, high-voltage control, regenerative braking and consumption analytics; ISO 26262 functional safety process, UNECE R155/R156 compliant, KBA certified.

Fleet operations layer (ITCS/AVMS): vendor-agnostic, ITxPT / IBIS-IP / GTFS-RT compliant, on-premise with no cloud dependency, open REST/MQTT interfaces. This is the data backbone needed to make fleet flexibility observable and verifiable.

Energy storage: ESS management software for depot-side buffering.

Deployed references: Napoli (70 vehicles, option), Timisoara trolleybus (33), Belgrade tram (25), Samsun tram (12), Istanbul metro (25 sets).

WHAT WE PROPOSE TO DEVELOP IN THE PROJECT (TRL 5 TO 6)

Our current stack optimises charging within a fixed grid limit. The R&D step we want to take with partners is to make the fleet an active participant in the regional system: bidirectional / V2G control at vehicle and charger level, building on our existing ISO 15118 and OCPP 2.0.1 interfaces; a flexibility interface that lets a DSO or aggregator call on depot capacity as a dispatchable, verifiable and contractually bankable service without breaking timetable adherence; and coupling with depot ESS, local PV and, where relevant, the depot's own heating and cooling demand for genuine multi-vector coordination.

This addresses CM2026-08 target topics 1 (multi-vector integration of regional infrastructures) and 3 (regional flexibility and congestion management).

WHAT WE ARE LOOKING FOR

Distribution System Operator (DSO) or regional grid operator, for the congestion / hosting-capacity case and flexibility procurement.

Need Owner: a municipality, regional authority or public transport operator willing to host the demonstration. We can facilitate introductions to Turkish municipal and public transport operators for a replication site; a formal commitment would be established jointly with the consortium.

Research organisation for grid modelling, flexibility valuation and V2G impact assessment.

Partners for market design, regulation and social/economic research, an area we deliberately do not cover ourselves.

Aggregator or flexibility market platform provider.

A second region for replication, ideally with a different grid topology and regulatory regime.

WHAT WE DO NOT OFFER

To save everyone time: we are not a grid operator, we do not do distribution network planning, market design or heat-network engineering, and we do not manufacture chargers. We are the software and integration layer between vehicle, charger and operations centre.

Role sought: WP or task leader for fleet and charging integration, demonstration and system validation. Open to joining an existing consortium.

Contact: Ezgi Sanli, Project Specialist, ezgisanli@bozankaya.com. Bozankaya Teknoloji, ASO Teknopark, Ankara, Turkiye.

Topic

  • Call Module 2026-08: Integrated regional energy systems

Type

  • R&D Partner
  • Technology Partner
  • Demonstrator
  • Validator/Living lab

Organisation

Similar opportunities