Nomgon Coal Bed Methane License project
CEO & Partner at NovaTerra LLC
Mongolia
About
GOH LLC holds the Nomgon-IX Coal Bed Methane Production Sharing Contract — at 2.25 million ha (22,500 km²) the largest of the four PSCs in Umnugovi province, and Mongolia's largest CBM position, located in the South Gobi Basin approximately 500 km south of Ulaanbaatar and ~70 km from the Gashuun Sukhait border crossing into China, the world’s largest gas import market. The world-class Tavan Tolgoi coking-coal complex sits at the centre of the PSC, providing established roads, power, water, labour and — from 2027 — heavy rail.
Eight field seasons (2019–2024) and US$20.5 million of expenditure have taken the asset from frontier acreage to the most-drilled CBM position in Mongolia: 49 wells (32,016 m), 1,075 km of 2D seismic across 47 lines, four CBM discoveries and a two-well pilot now in production and dewatering. ERCE’s independent 2020 assessment attributes a risked prospective resource of 14.6 Tcf (best case; 19.9 Tcf mean) to the PSC, with a 30% chance of geological success, and an initial contingent resource (2C recoverable 24 Bcf) was booked in 2021 over the small initial power-project supply area.
Following Elixir Energy’s February 2025 farm-out and the completion of Elixir’s exit on 17 August 2026, GobiTerra (UK) Ltd holds 100% of Golden Horde Pty Ltd and thereby of GOH LLC — a single-owner structure with no minority interests or carry obligations. The sponsors are now raising Phase A strategic capital of US$20–35 million to complete appraisal, deliver sustained pilot gas flow, and convert the resource base into Mongolia’s largest independent 2C certification — the platform for FID inside 18 months and first commercial gas in years 4–5.
Highlights
• Scale: the largest CBM PSC in Mongolia — 2.25 million ha (22,500 km²), with >700,000 ha of prospective sedimentary basins; risked best-case prospective resource of 14.6 Tcf (ERCE, 2020).
• Proof: four CBM discoveries (Yangir West, Yangir Big Slope, Nomgon–Tsagaan Tolgoi, Nomgon Pilot); coal seams 20–71 m thick; gas contents up to ~5.5 m³/t (as-received) in the Big Slope series.
• Pilot: a two-well pilot is in production testing and dewatering; demonstrating sustained gas flow is the objective of the current programme.
• Location: inside the Tavan Tolgoi corridor: dual-gauge railway under construction to 165 Mt/yr coal capacity by 2027; prospective routing of the 50 bcm/yr Soyuz Vostok / Power of Siberia 2 trunk line (trilateral MOU, September 2025).
• Clean structure: GobiTerra (UK) Ltd holds 100% following completion of Elixir Energy’s exit on 17 August 2026 — one seller, no minority interests, no carry obligations, no options outstanding.
• Validated market: Jade Gas’s November 2025 A$70M / US$46M LOI with Zhengzhou Langrun and TMK Energy’s Talon farm-in show Chinese and regional strategic capital actively funding Mongolian CBM today.
Project Location
- Mongolia
Project Format
- Private Project
Go Global Project
- Yes
ESG (Environmental, Social, and Governance)
- Yes
Project Stage
- Partner Identification
Government approval on
01/09/2018
Main Project Sector
- Energy and Natural Resources
Energy and Natural Resources
- Energy Storage
- Fossil Fuel Power Plants
- Hydrogen Energy
- Mining
- Oil & Gas
Total Project Value
- 25,000,001 to 50,000,000 USD
Investment Capital Required
- 25,000,001 to 50,000,000 USD
Interested Format of Cooperation
- Convertible Loan
- Direct Equity Investment
- Equal Shareholdings
- Majority Shareholdings
- Joint Venture
- M&A / Strategic Acquisition Opportunity
- Open for Negotiation
Preferred Financing Model
- Equity
- Lease / Asset Backed Financing
- Public / Alternative Financing
- Open for negotiation
Type(s) of Last Financing Round of the project (if Applicable)
- Equity (private)
Total amount raised (USD)
20'000'000
Main Service(s) Required
- Infrastructure Services
Attached files
Organisation
Mongolia
Similar opportunities
Project
Energy Infrastructure Development in Mongolia
- Yes
- Yes
- Debt Financing
- Public Utilities
- Convertible Loan
- Contract Drafting
- 50,000,001 USD or above
- Infrastructure Services
- 10,000,001 to 25,000,000 USD
- Public-Private Partnership Project
Christopher Tang
Director at Longman Group
China (Hong Kong)
Project
The Morupule Coal Mine Rail Logistics Project 25-year concession.
- No
- No
- Rail
- Debt
- Equity
- Open for negotiation
- Professional Services
- Partner Identification
- Direct Equity Investment
- Government & Public Funding
- 10,000,001 to 25,000,000 USD
- Private Equity & Venture Capital
- Public-Private Partnership Project
- Transport and Logistics Infrastructure
Vincent. C Hendry
CEO at East Tide 928 (Pty) Ltd
South Africa
Project
- No
- Yes
- Technology
- Data Centre
- Construction
- Private Project
- Equity (private)
- Big Data Solution
- Open for negotiation
- Infrastructure Services
- 25,000,001 to 50,000,000 USD
- 10,000,001 to 25,000,000 USD
Susana Munoz
Managing Partner at GBA LATAM TRADE AND INVESTMENT ADVISORS
China