WindEnergy Match 2026

23 – 29 Sept 2026 | Hamburg, Germany

Register
Register
Register

ServiceUpdated on 15 September 2026

Vessel Conversion

Head of Business Development at Dimension Consultants Pte Ltd

London, United Kingdom

About

  • /01

    Feasibility & concept design

    Mission analysis, vessel selection, motion & capability studies and ROM cost estimates.

  • /02

    Cable lay vessel conversion

    Adding turntables/carousels, tensioners, lay spreads, DP upgrades, accommodation and helideck modifications.

  • /03

    Geotechnical drill ship conversion

    Moonpool installation, derrick & drill floor integration, drill mud system and laboratory modules.

  • /04

    Detailed design & class approval

    Full conversion design package: GA, structural, marine systems, electrical and outfitting — approved through class.

  • /05

    Yard supervision & commissioning

    On-site engineering team during conversion, supporting yard, owner and class through delivery and sea trials.

Type

  • Development
  • Consulting

Applies to

  • Wind energy (onshore, offshore, repowering & recycling)

Organisation

Dimension Consultants Pte Ltd

Supplier / Sub-contractor

Singapore, Singapore

Similar opportunities