ExpertiseUpdated on 25 April 2025
Space HW Product Industrialization
About
LIDAX is able to deliver dozens of units at the appropiate cadence or delivery rate like it is requested in PLATO Focal Planes where x26 FM Units + Flight Spares shall be delvered 1 FM of integrated PLATO FPAs, each 2-3 weeks.
Rather than the classical delivery on any other Institutional Scientific Mission that use to be only 1 or 2 FM units, based on the experience achieved on Programs like TO-MTG, LIDAX is able to to consolidate an Industrial Process within the organization, not only viewed from a serialization of the Space Hardware production, but more important through the implementation of methodologies and specific processes required at different levels of the organization (supply chain, quality and, manufacturing engineering capability) with the aim to achieve the requested delivery rate
This Industrialization methodology allows to the company to offer to our customers a space product industrializacion (even if a redesign of the product itself is required for this) with multiple possibilities on different market segments with the goal to optimize the cost per unit but also decreasing the time to market for:
• “New Space” Opportunities,
• Earth Observation Private Initiatives
• Astronomy on Ground / Space Surveillance and Tracking Cameras / Defense
Similar opportunities
Service
Environmental Test Campaigns, Bake-outs & Cryogenics Testing
Jesus Aivar
General Manager at LIDAX Electro-Optical Systems
Madrid, Spain
Product
In Orbit Servicing Developers looking for LIDAR Technologies
Jesus Aivar
General Manager at LIDAX Electro-Optical Systems
Madrid, Spain
Expertise
Data Spaces, Local Digital Twins, Citiverse
Vincent Demortier
Creative Technologist at DIH FbN
SAINT-QUENTIN, France