ProductUpdated on 3 November 2025
350 kW battery-buffered charger on weak grids
Head of Sales and Marketing at Fremsyn Group A/S - Nerve Smart Systems (B-HPC)
Lyngby, Denmark
About
The B-HPC (Battery-Integrated High-Power Charger) delivers ultra-fast 350 kW EV charging – even with a grid connection as low as 100 kW. Powered by the patented Nerve Switch® technology, the system manages each battery cell individually, ensuring efficient, balanced, and intelligent charging. With its plug and play design, the B-HPC can be installed in just two hours using existing 32–160 A connections – without costly civil works. During grid power outages, the unit continues operation and can supply electricity as a local backup power source through its integrated AC outlets. Even if the internet connection is lost, the charger remains fully operational, with payments processed locally and data automatically synchronized once reconnected. Designed, developed, and built in Denmark
Looking for
- Re-Seller/Wholesaler
- Manufacturer
- Investment/Finance
Applies to
- ENERGY | Energy Saving and Energy Efficiency Equipment and Technologies
- ENERGY | Green Power Generation
- ENERGY | Independent Power Supply
- ENERGY | Manufacturers of energy and electrical equipment / materials / machinery
Attached files
Organisation
Similar opportunities
Product
- Buyer
- Subcontractor
- ENERGY | Green Power Generation
- ENERGY | Independent Power Supply
Iurie Dubencu
Sales Manager at ComAp a.s.
Prague, Czech Republic
Service
International trade & business matchmaking services
- Consulting
- Environment
- Rail & Road
- Energy & Power
- Water Management
- Construction & Buidling
Hao-Yun Liang
Project manager at Taiwan external trade development council (TAITRA)
Taipei, Taiwan
Product
Mobile and autonomous Energy generation
- Re-Seller/Wholesaler
- ENERGY | Green Power Generation
- ENERGY | Independent Power Supply
- ENERGY | Power Generation and Transmission/Transformation Equipment
Frédéric ROHMER
CEO at ECOSUN Innovations
Wettolsheim, France