Hydrogen & CCUS Connect 2026

20 – 22 Oct 2026 | Hamburg, Germany

ServiceUpdated on 29 September 2026

PV-WIND-HYDROGEN SYSTEM PLANNING SIMULATION AND MODELING

Director of Engineering Services at Leidong Energy

Beijing, China

About

  1. Access Mode Planning

    • Grid-Peaking

    • Grid-Friendly

    • Off-grid

  2. Hydrogen Production Capacity Sizing

    • Wind-to-Hydrogen Sizing

    • PV-to-Hydrogen Sizing

    • Wind-Solar-to-Hydrogen Sizing

  3. Storage Capacity Optimization

    • Battery Energy Storage Sizing

    • Hydrogen Storage Sizing

  4. Grid Architecture Design

    • Near-End / Far-End Connection

    • AC / DC Transmission

    • Grid-Connected / Off-Grid Mode

  5. System Optimization

    • Electrical Topology Optimization

    • Equipment Selection Optimization

    • System Design Optimization

Type

  • Consulting

Organisation

Leidong Energy

Company (SME)

Beijing, China

Similar opportunities