Project cooperationUpdated on 10 October 2025

KiigGen: Edge AI retrofit with 3D, interface bridge and real time operation

Project Manager at Logiicdev GmbH

Graz, Austria

About

Enable existing system to integrate the advance technology of health monitoring, 3D based analysis,adaptive control, low-latency inference, scalability, industrial bus bridge, PQC security, and parallel processing. This is low SWaP-C (Size, Weight, Power and Costs) design with robust, reliable, and resilient AI hardware architecture/solution. we provide alternative to Nvidia solution (high power consumption).

Video:https://www.youtube.com/watch?v=ZqgMiAsqrLg

Stage

  • Early

Topic

  • HORIZON-JU-ER-2025-FA1-TT-01: NETWORK MANAGEMENT PLANNING AND CONTROL & MOBILITY MANAGEMENT IN A MULTIMODAL ENVIRONMENT AND DIGITAL ENABLERS
  • HORIZON-JU-ER-2025-FA2-01: DIGITAL & AUTOMATIC UP TO AUTOMATED TRAIN OPERATIONS
  • HORIZON-JU-ER-2025-FA3-01: INTELLIGENT & INTEGRATED ASSET MANAGEMENT
  • HORIZON-JU-ER-2025-FA4-01: A SUSTAINABLE AND GREEN RAIL SYSTEM
  • HORIZON-JU-ER-2025-FA5-01: SUSTAINABLE COMPETITIVE DIGITAL GREEN RAIL FREIGHT SERVICES
  • HORIZON-JU-ER-2025-FA6-01: REGIONAL RAIL SERVICES / INNOVATIVE RAIL SERVICES TO REVITALISE CAPILLARY LINES
  • HORIZON-JU-ER-2025-EXPLR-01: STUDIES ON RAIL INDUSTRY 5.0
  • HORIZON-JU-ER-2025-EXPLR-02: STUDIES ON INNOVATION IN CLIMATE FINANCE FOR RAIL
  • HORIZON-JU-ER-2025-EXPLR-03: EXTENDING THE RAIL NETWORK OF PHDS
  • HORIZON-JU-ER-2025-EXPLR-04: SUPPORT TO THE EUROPEAN FRMCS DEPLOYMENT GROUP

Type

  • Beneficiary

Organisation

Logiicdev GmbH

Company (SME)

Graz, Austria

Similar opportunities