Dragos Sopoglu

RES O&M Director

CEZ Romania

Constanta, Romania

18 profile visitsParticipant from Romania

RES O&M Director of Fantanele and Cogealac Wind Farm . Operation of 600 MW of wind energy and 22 MW of Hidro power plants .

My organisation

On March 31, 2021, the companies Distributie Energie Oltenia, Ovidiu Development, Tomis Team, MW Team Invest, CEZ Vanzare, TMK Hydroenergy Power and CEZ Romania were acquired by the funds managed by Macquarie Asset Management (MAM). Ovidiu Development, Tomis Team, MW Team also manage the largest operational wind farm on land in Romania, in the Dobrogea area, at Fantanele, Cogealac and Gradina. The Wind Park meant an investment of 1.1 billion Euros and contains 240 wind turbines with a total installed power of 600 MW. The entire capacity of the Wind Parks was put into operation at the end of 2012. TMK Hydroenergy Power manages the hydropower system near Resita, Caras-Severin county, consisting of 4 microhydropower plants (Grebla, Crainicel 1, Crainicel 2 and Breazova) and the related hydro facilities at Trei Ape, Gozna, Valiug and Secu. Also, following the investment in the rehabilitation of the Resita hydropower plant complex in order to increase efficiency, the production capacity rose from 18MW to about 22MW after the completion of the modernization process.
Read more

About me

RES O&M Director

My organisation

On March 31, 2021, the companies Distributie Energie Oltenia, Ovidiu Development, Tomis Team, MW Team Invest, CEZ Vanzare, TMK Hydroenergy Power and CEZ Romania were acquired by the funds managed by Macquarie Asset Management (MAM). Ovidiu Development, Tomis Team, MW Team also manage the largest operational wind farm on land in Romania, in the Dobrogea area, at Fantanele, Cogealac and Gradina. The Wind Park meant an investment of 1.1 billion Euros and contains 240 wind turbines with a total installed power of 600 MW. The entire capacity of the Wind Parks was put into operation at the end of 2012. TMK Hydroenergy Power manages the hydropower system near Resita, Caras-Severin county, consisting of 4 microhydropower plants (Grebla, Crainicel 1, Crainicel 2 and Breazova) and the related hydro facilities at Trei Ape, Gozna, Valiug and Secu. Also, following the investment in the rehabilitation of the Resita hydropower plant complex in order to increase efficiency, the production capacity rose from 18MW to about 22MW after the completion of the modernization process.

Social media