BnR Summit 2026

Belt & Road Summit - Deal-Making 2026

9 – 15 Sept 2026 | Hong Kong, China (Hong Kong)

ProjectUpdated on 6 September 2026

Renewables and Green Energy Project Develeopment in Indonesia

C.E.O and Founder at Petronesia Global Holdings Limited

Indonesia

About

Objective

The objective of the Fund Raising for the incoming future projects in Gas exploitation,Geothermal Exploration,

RDF Plant / Waste Municipal Treatment, Solar Power and some feasibility studies stage of early stage of the project.

  Petronesia Global Holdings Limited

BackGround

Petronesia Global Holdings Limited was established by 2018 which focus on Energy Investment and Development. The company focus on the conventional energy development and also the renewables energy. Currently , The companies cooperates exclusively with the major player in the world for Drilling Rig manufacture and technologies, Geological and Geophisical studies and analysis , processing and interpretation and the environmental Waste Municipal Treatment.

Fund raising requirements :

 Offshore Gas Dev : USD 35 Millions

Geothermal Dev. : USD  15 Millions

RDF Plant  :  USD 40 Millions

Feasibility Studies 3 projects  USD 1 M

Solar Power Development 300 MW : USD 400 Millions

Oil and Gas exploitation : USD 40 M

Contact

 sekretariat@petronesia.com

·       www.petronesia.com

·       Telephone : (+852) 39764282

·       Lockhart Road 3th, 22 floor, Wan Chai, Hong Kong, SAR China

Investor relations : Savilla Azzahra

Asset DEVELOPMENTS AS UNDERLYING

OFSSHORE GAS DEVEOPMENT

Petronesia is processing to acquire the 70 percents Black Box Energy in Sumatera Island territory. The project is Offshore project which drilling for 1000 meters and has the indication from the previous drilling. The Reserve of Methane could achive the 500 BCF and could reserve for 15 years. Petronesia will conduct the 2 wells offshore drilling and creates the processing facilities to process the LNG plants , Gas Power plant and Fuels cells facilities.

REFUSED DERIVATIVE FUELS ( WASTE MUNICIPAL TREATMENT)

Petronesia is processing the Pre feasibilities study for the RDF plant in Central Java for 500 Ton per day capacity to treat the municipal waste and procees to the RDF plant. With the area for 10 ha , we will convert the waste to RDF product and also the composs product. And the plant will expand  to another surrounding area which total additional to be come 1000 Ton perday.

OIL AND GAS

Petronesia is processing for exploitation the Central Sumatera

Basin which number of wells is 10 wells. The method is using

Unconventional Method and also Low Carbon Reservoar which

Utilization on the Fracturing and Directional Drilling.

Geothermal

Petronesia is processing for the one project for study in Sumatera

And anothers direct negotiation for Sangkala Block in East Java.

The preliminary study of the block informs that the capacity of

Geothermal in the area could achive 40 MW capacilty. And all

Production will be supply to National Electric Grid.

At this first stage of process, we will do the study of the Sangkala

Block and 1 well drilling for futher evaluation of the reserve.

Solar Power

Petronesia is final negotiation of the development of 300 MW

Solar Power in Africa. We will take 70 percent Major stakes and

Responsible for Engineering, Procurement and Construction ,

Operation and Maintenance.

The first stage of the project is 300 MW and there are additional of

The capacity 300 MW for second stage.

Project Location

  • Indonesia

Project Website

www.petronesia.com

Project Format

  • Private Project

Go Global Project

  • Yes

ESG (Environmental, Social, and Governance)

  • Yes

Project Stage

  • Investment / Financing Discussion

Government approval on

NA

Tender submission by

NA

Contract awarded on

Now

Target completion by

010627

Main Project Sector

  • Energy and Natural Resources

Energy and Natural Resources

  • Energy Storage
  • Fossil Fuel Power Plants
  • Geothermal Energy
  • Hydrogen Energy
  • Oil & Gas
  • Solar Energy
  • Waste To Energy
  • Other Renewable Energy

Manufacturing

RDF plant

Public Utilities

  • ICT And Data Center
  • Waste Treatment

Technology

  • Building And Construction Technology
  • Education Technology
  • Environmental Technology
  • Health Technology
  • Medical Technology
  • Property Technology

Urban Development

  • Health Facilities
  • Hospitality & Tourism
  • Smart City Development
  • New Town Development
  • Industrial Parks
  • Free Trade Zone

Total Project Value

  • 50,000,001 USD or above

Investment Capital Required

  • 50,000,001 USD or above

Interested Format of Cooperation

  • Direct Equity Investment
  • EPC / Turnkey
  • Equal Shareholdings
  • M&A / Strategic Acquisition Opportunity

Preferred Financing Model

  • Debt
  • Equity

Type(s) of Last Financing Round of the project (if Applicable)

  • Equity (private)

Total amount raised (USD)

100 Millions

Return on Investment

13 percent

Main Service(s) Required

  • Environmental Services
  • Professional Services

Environmental Services

  • Green Building Solutions & Services
  • Resource Recycling
  • Waste Management

Financial Services

  • Commercial Banking
  • Fund Management
  • Hedge Funds
  • Institutional Investment
  • Investment Banking
  • Islamic Finance
  • Mergers & Acquisition
  • Private Banking
  • Private Equity & Venture Capital
  • Trust Fund
  • Wealth Management

Information Technology Services

  • Cloud Solution
  • Enterprise Solutions
  • Risk Management (ITS)

Similar opportunities